You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: 43ADG-S4042
Time remaining
Header Information
Bid Number:
43ADG-S4042
Description:
DEM - UPS Battery Replacement & PM
Bid Opening Date:
10/30/2026 05:59:59 PM
Purchaser:
Theresa Sianez
Organization:
Adjutant General
Department:
431 - Adjutant General and National Guard
Location:
3650 - Military
Fiscal Year:
27
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
10/09/2026
Available Date :
10/12/2026 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
Ship-to Address:
Bill-to Address:
Bill To: OTAG State Admin
2460 Fairview Dr
Office of the Military
Adjutant General
State of Nevada
Carson City, NV 89701
US
Email: admin-mil@govmail.state.nv.us
Phone: (775) 884-8457
Alt. Reference: 262
Print Format:
File Attachments:
Quote Instructions
DEM UPS Battery Replacement and PM Invitation to Bid
DEM UPS Battery Replacement PM Scope of Work
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Emergency purchase:
No
Procurement type:
Services (or combined goods and services)
Purchase from an existing contract (agency or statewide)?:
No, this purchase is not from a contract
Contract type:
Vendor (Contract for Service of Independent Contractor, NRS 333.700)
Anticipated BOE/Clerk approval:
December
Anticipated contract start date:
12/07/2026
Anticipated contract end date:
06/30/2028
State Purchasing facilitated solicitation:
No
Item Information
Item # 1: ( 939 - 37 )
The State of Nevada, The Office of the Military, is seeking bids/proposals from qualified contractors to provide services for the following to perform installation of new batteries, repair and perform an overall maintenance that is needed on (2) UPS units. The contractor shall provide all labor, tools and equipment to work on accomplish what is required on this project. The contractor shall provide and install new batteries in the current UPS units. The contractor is also responsible for all materials, tools, hardware, and labor to complete this project. Contractor is also responsible for properly disposing of all materials that have been removed from this project. Remove existing batteries from 2 UPS units. Provide and install new batteries for the 2 UPS units. Install batteries and interconnect wiring prep for cutover. Replace necessary cables, terminals end, and fuses. Contractor to remove, dispose of, and recycle the old batteries that are pulled out of the UPS units. Contractor to perform a preventative maintenance analysis on both UPS units.
NIGP Code:
939-37
Electronic Equipment Maintenance and Repair
Qty
Unit Cost
UOM
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status